DISTRICT PROFILE
ESC Region: 6
City, State Zip: DALLARDSVILLE,
TX 773320188
Phone: (936) 563-1000
Fax: (936) 563-1010
Number of Campuses: 1
Total Student Enrollment: 476
District Size:
Under 500
Percent Econ. Disadvantaged: 53.60%
Technology Expenditures: $177,785.00
- Teaching and Learning Budget:
$31,000.00
- Educator Preparation and Development Budget: $5,000.00
-
Administration and Support Services Budget: $11,845.00
- Infrastructure for
Technology Budget: $129,940.00
Technology Expenditure Per Pupil: $373.50
Number of Campuses with Direct
Connection to Internet: 1
Percentage of Campuses with Direct Connection to
Internet: 100.00%
Number of Classrooms with Direct Connection to Internet:
35
Percentage of Classrooms with Direct Connection to Internet:
100.00%
Computer/Student Ratio: 2 student(s) for every
computer
Computer/Teacher Ratio: 1 teacher(s) for every computer
Number of
campuses that need to complete the Texas Campus STaR Chart: 1
Percentage of
campuses that have completed the Texas Campus STaR Chart: 100.00 %
PLAN INTRODUCTION
Plan Last Edited: 02/28/2006
Technology Planning Committee:
Susan Crawford-Tech Coordinator/Teacher
Vonda Toler-CATE teacher
Ava Brown-Libarian
Charlotte
Treadway-Teacher
Debbie Oliver-Elementary Teacher
Linda Kidd-Business
Secretary
Zach Thigpen-student
Kenneth Graham-Superintendent
Sephanie Hendrix-teacher/counselor
Diannne Holbrook-principal
Jeff
Ashen-student
Karen Heart-teacher
EXECUTIVE SUMMARY
The Big Sandy Independent School District (BSISD)
recognizes the increasing need to know more, how to access information, to
communicate, and to understand. Utilizing technology in well balanced PreK-12
and community outreach programs, BSISD will provide students, faculty, and the
community the opportunity to develop lifelong learning skills and marketable
competencies.
It is the vision of BSISD to develop a greater sense of
understanding and the skills required to access the global sources of knowledge.
Integrating technology as a part of the curriculum, students, faculty and the
community will have the opportunity to develop lifelong learning skills and use
personally and professionally.
Because BSISD provides the majority of
enrichment experiences that students have with the outside world, every student,
regardless of economic background, should be immersed in technology experiences
from around the world. With optimal computer access, students and teachers can
experience a renewed enthusiasm for learning and for broadening their
perspectives beyond geographical and economic limitations.
The Long
Range Technology Plan is a working framework that Big Sandy plans to use to
achieve its vision of technology for the district. It is reviewed once a year
and changes are made as needs are addressed.
NEEDS ASSESSMENT
Assessment Process: The performance of
students served by Big Sandy ISD is diminished because of the extreme
geographical isolation and limited resources due to the size of our district.
This isolation of the district, combined with the economics of the area,
restricts student educational resources, staff development, and community
growth. It is a 28 mile drive one way to the nearest library, found in
Livingston. The nearest university libraries are more than an hour’s drive from
the school.
To enhance the lives of these students we must first provide
a quality education. It is difficult not only because of the geographical
location but also the limited resources due to the size of the district. BSISD
employs 36 teaching professionals in grades PreK-12. Having qualified and
equipped personnel to meet the needs of our students is a challenge. As a
result, teachers have multiple preparations with few resources to assist them.
Due to our remote rural location we are unable to transport students to sites
which would enhance their cultural and intellectual growth. We feel that the
district has a challenge to deploy advanced technology in every classroom.
BSISD teachers, administration, and students need to be computer
literate and familiar with all types of current emerging technologies. Staff
members need to use technology as learning tools in all academic subject areas.
Students need access to computer-based and technological learning to become
productive in the future work place and global technological world.
Big
Sandy ISD uses a comprehensive needs accessment using teacher/parent surveys,
interviews, inventory, site Chart base decison making recomendations, and Texas
STaR to address areas of need.
Existing Conditions:
Statement of Existing Conditions
Big
Sandy ISD is made up of one campus. At the present time, we have Internet access
in every classroom with at least two computers (and up to five) connected to the
internet and the BSISD LAN.
BSISD enjoys the benefits of a fiber
backbone WAN and 10/100 mbs switched LAN. We are members of the RESNet
consortium and COMNet. RESNet is a consortium of eleven members consisting of
local schools, county governments, and local hospitals. All RESNet members are
connected via fiber optic WAN. COMNet is a consortium of most of the school
districts in Region VI ESC. COMNet members are joined by a T-1 Line connected to
ESC VI.
We have four computer labs and one mobile laptop lab. The High
School lab consists of 23-3.6 GHz, 512 Meg RAM, Windows XP Pro workstations.
These workstations are used to teach BCIS, Technology Applications, Keyboarding
and available for student/faculty research. The second lab is located in the
Middle school building and consists of 20 -2.8 Ghz, 1 Gig RAM Nobilis Windows XP
workstations and are used to teach Web Mastering, Digital Graphic Animation,
Desktop Publishing, Odyssey, Networking & Telecommunications and are
available for student/faculty research.
The third lab is located in the
Middle school building and consists of 12 2.8Ghz or better, 364 RAM or better,
Windows XP Pro Premio workstations and 9-Pentium III, 128R RAM, windows 98
workstations and are used to teach Computer Applications, Life Skills,
Keyboarding and are available for student/faculty research.
The fourth
lab is located in the Elementary school building and consists of 20 Pent III,
364 RAM windows XP workstations and are used to teach computer applications and
are available for student/faculty research.
The mobile laptop lab
consists of 20 wireless HP notebook computers with PIII, 128 RAM, Windows 98,
and a wireless unit. The mobile unit is stored in a self contained cart that is
available for classroom use and may be moved to the needed location where the
wireless unit may be plugged into the LAN port to provide online and network
resources.
We have two Distance Learning consoles that consists of Large
Screen TV monitor, a camera, VCR, and computer. One is used extensively for
Distance Learning and Staff Development.
We have five projectors that
interface with computers, one of which displays on a 12’ electric roll down
projection screen.
We have 6 Palm Pilots. The Palm pilots are used to
collect student performance data as teachers assess individual students using
the TPRI as a benchmark. Once assessment is complete, various data analysis
tools and teaching intervention strategies are used to improve student
performance.
Technology Needs:
Items that were found needed: infastructure,
hardware, software, programs, courses, student achievement, technology
resources, staff development, and technical support.
GOALS, OBJECTIVES, AND STRATEGIES
Goal 1: Develop planning and policy procedures.
Objective
1.1: Establish need policies concerning the use and application of
educational technology.
Budget for this objective: $0.00
LRPT Category:
Infrastructure for Technology
E-Rate Correlates:
NCLB Correlates: 06 08
09
Strategy 1.1.1: Allow the needs to drive the technology
planning committee.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Faculty, Parents, Students,
Community, Technology Coordinator
Evidence: Periodic Needs Accessment Surveys
by faculty/staff and Tech Planning Committee and Site Based Desicion Making
Commitee
Comments:
LRPT Correlates: AS01, AS02, AS03, AS04, AS05, AS06,
AS07, AS08, EP01, EP13, EP14, I01, I02, I04, I08
Strategy 1.1.2:
Revise and edit long range plan for technology.
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Tecnology Planning
Committee
Evidence: Continually review and revise plan to meet ongoing
needs.
Comments:
LRPT Correlates: AS01, AS02, AS03, AS04, AS05, AS06,
AS07, AS08, EP13, EP14, I01, I02, I04, I08
Strategy 1.1.3: Yearly,
BSISD will complete the Texas STaR chart to access the districts technology and
readiness.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus Principals, Faculty,
Technology Coordinator, Tech Planning Committee
Evidence: Texas Star Chart
will be submitted
Comments:
LRPT Correlates: AS01, AS02, AS03, AS04,
AS05, AS06, AS07, AS08, TL14, TL15
Strategy 1.1.4: Seek
opportunities for faculty/staff/students and community members to take
college/career courses
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee
Evidence: Number of courses
offered
Comments:
LRPT Correlates: AS01, AS02, AS03, AS04, AS05, AS06,
AS07, AS08, EP13, EP14, I01, I02, I08, TL14, TL15, TL16, TL17, TL21
Goal 2: Provide high quality ongoing staff development and
support.
Objective 2.1: A comprehensive staff development plan
to provide effective use of technology.
Budget for this objective:
$5,000.00
LRPT Category: Educator Preparation and Development
E-Rate
Correlates: ER01 ER02
NCLB Correlates: 01 02 03 04b 06 07 11
Strategy 2.1.1: Provide training to integrate age appropriate
technology TEKS into the curriculum PreK-5.
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration, Campus
Principals, Faculty, Tech Coordinator
Evidence: Percentage of staff attending
Professional Development training.
Comments:
LRPT Correlates: EP01, EP02,
EP03, EP04, EP05, EP06, EP07, EP08, EP09, EP10, EP11, EP12, EP13, EP14, I08,
TL01, TL02, TL03, TL08, TL12, TL14
Strategy 2.1.2: Provide
appropriate training to staff members on using a computer for District mandated
grading program.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus Principals,
Technology Coordinator
Evidence: Percentage of Staff using District mandated
grading programs
Comments:
LRPT Correlates: EP01, EP05, EP07, EP08, EP09,
EP11, EP12, EP13, I06, I08, I10, I15
Strategy 2.1.3: Provide
adequate training to faculty in the use of Renaissance program
curriculum.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus Principals,
Technology Coordinator
Evidence: Percentage of Staff using Renaissance
Products
Comments:
LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP06,
EP07, EP08, EP09, EP10, EP11, EP12, EP13, EP14, I08, I10, TL01, TL02, TL07,
TL08, TL09, TL10, TL11, TL13, TL15, TL18, TL20
Strategy 2.1.4:
Provide after school and inservice day training opportunities for staff to
develop skills to meet minimum technology competencies.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administraiton, Campus Principals, Technology Coordinator
Evidence: Tech
training will be scheduled on at least one in-service day. Perrcentage of staff
that master computer competency test.
Comments:
LRPT Correlates: EP01,
EP02, EP03, EP04, EP05, EP07, EP08, EP09, EP11, EP12, EP13, I01, I02, I03, I06,
I07, I08, I13, TL03, TL07, TL08, TL10, TL14, TL15
Strategy 2.1.5:
Provide support services to meet ongoing needs.
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration,Campus
Principals, Technology Coordinator
Evidence: Needs Assessment-Texas Star
Chart
Comments:
LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP06,
EP07, EP08, EP09, EP10, EP11, EP12, EP13, EP14
Strategy 2.1.6:
Identify funding sources to support a continous, high quality staff development
program of professional development for all new technologies
introduced.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus
Principals
Evidence: Staff development expenditures
Comments:
LRPT
Correlates: AS01, EP01, EP02, EP03, EP05, EP13, I11, I12, TL07,
TL08
Strategy 2.1.7: Provide professional development for TEKS
into other curriculum areas
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration,Campus
Principals
Evidence: Number of faculty attending professional development
training
Comments:
LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP06,
EP07, EP08, EP09, EP11, EP13, I01, I04, I08, TL01, TL02, TL07, TL08,
TL12
Strategy 2.1.8: Provide staff development for computer driven
business software such as Peims, Rsccc, Library automation.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Staff
Evidence:
Percentage of staff attending training.
Comments:
LRPT Correlates: AS01,
AS03, EP01, EP08, EP10, EP13, I01, I02, I03, I06, I07, I08, I10, I12, TL03,
TL05, TL13, TL14, TL15, TL18
Strategy 2.1.9: Provide staff
development for computer driven software such as AESIT and TPRI that assist
staff in accessment of student achievment and at risk content areas.
State:
Revised
Status: Planned
Timeline: 2006-2010
Person(s) Responsible:
Administrators, Campus Principals, Counselor, Technology Coordinator, and
Staff
Evidence: Percent of staff attending training and capable of using
AESIT and TPRI software.
Comments:
LRPT Correlates: AS01, AS02, AS03,
AS08, EP02, EP03, EP04, EP05, EP07, EP08, EP11, EP13, I01, I02, I06, I08, I10,
TL01, TL02, TL03, TL07, TL08, TL09, TL10, TL11, TL18
Goal 3: Provide all learners with with current appropriate technological
resources and support.
Objective 3.1: Provide neccessary
hardware needed to support curriculum, financial, and business
services.
Budget for this objective: $129,940.00
LRPT Category:
Infrastructure for Technology
E-Rate Correlates: ER01
NCLB Correlates: 01
02 03 04a 04b 05 06 08 09 10 11 12
Strategy 3.1.1: Increase
number of computers in each classroom form existing number to 5.
State:
Original
Status: In Progress
Timeline: 2005-ongoing
Person(s)
Responsible: Administration,Campus Principals, Technology Coordinator,
Technology Planning Commitee
Evidence: Units purchased and in
place.
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06, I07, I08,
I09, I10, I11, I12, I13, I14, I15
Strategy 3.1.2: To add an
elementary computer lab of at least 20 workstations with access to BSISD LAN and
internet.
State: Original
Status: Completed
Timeline:
2004-2005
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee
Evidence: Computer lab in place
and operational
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06,
I07, I08, I09, I10, I11, I12, I13, I14, I15
Strategy 3.1.3: To add
a middle school of at least 20 workstations with access to BSISD LAN and
internet.
State: Original
Status: Completed
Timeline:
2004-2005
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee
Evidence: Computer lab in place
and operational
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06,
I07, I08, I09, I10, I11, I12, I13, I14, I15
Strategy 3.1.4: To
provide a laser high quality printer to each classroom in the
district.
State: Original
Status: In Progress
Timeline:
2004-ongoing
Person(s) Responsible: Administration,Campus Principals,
Technology Coordinator, Technology Planning Committee
Evidence: Number of
classrooms with a laser printer.
Comments:
LRPT Correlates: I01, I02,
I03, I04, I05, I06, I07, I08, I09, I10, I11, I12, I13, I14,
I15
Strategy 3.1.5: To replace older computers and printers every
three to five years on a raotaqtion basis.
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration,Campus
Principals, Technology Coordinator, Technology Planning Committee
Evidence:
Number of computers/printers replaced.
Comments:
LRPT Correlates: I01,
I02, I03, I04, I05, I06, I07, I08, I09, I10, I11, I12, I13, I14,
I15
Strategy 3.1.6: Provide network drops, switches, and cables to
all computers in the computer lab(s) so that students and faculty have access to
BSISD LAN and internet
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee
Evidence: Network drops
installed
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06, I07,
I08, I09, I10, I11, I12, I13, I14, I15
Strategy 3.1.7: Provide a
laptop computer to each faculty member with access to BSISD LAN and
internet.
State: Original
Status: Planned
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee
Evidence: Laptops
purchased
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06, I07,
I08, I09, I10, I11, I12, I13, I14, I15
Strategy 3.1.8: Provide the
neccessary hardware for Distance Learning Console.
State: Original
Status:
In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator,
Evidence: Hardware
and programming are installed and operative
Comments:
LRPT Correlates:
I01, I02, I03, I04, I05, I06, I07, I08, I09, I10, I11, I12, I13, I14,
I15
Strategy 3.1.9: Provide neccessary hardware for TPRI and AESIT
programs, which identify at risk students and low performance
objectives.
State: Revised
Status: Planned
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus Principals,
Technology Coordinator, Technology Planning Committee, Teachers
Evidence:
TPRI reports, Number of students being evaluated using the TPRI and AESIT
programs
Comments:
LRPT Correlates: AS01, AS02, AS03, I01, I02, I07, I08,
I10, TL01, TL02, TL07, TL08, TL10, TL11
Objective 3.2: Provide
neccesary software and upgrades needed to support curriculum, financial and
business services.
Budget for this objective: $11,845.00
LRPT Category:
Administration and Support Services
E-Rate Correlates: ER01 ER02
NCLB
Correlates: 01 02 03 04a 04b 05 06 07 08 09 10 11 12
Strategy
3.2.1: Maintain and upgrade existing software.
State: Original
Status:
In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Technology Planning
Committee
Evidence: Needs Accessment survey-TEXAS STaR Chart
Comments:
LRPT Correlates: AS01, I01, I02, I03, I08, I11, I12, I13
Strategy
3.2.2: Increase staff and student access to technology through the use of
automated library system.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Technology Planning Committee, Librarian
Evidence: Percentage of
student/staff using automated library resources.
Comments:
LRPT
Correlates: AS01, AS06, EP04, EP06, EP10, EP13, I01, I02, I03, I07, I08, I10,
I11, I12, TL03, TL05, TL18, TL21
Strategy 3.2.3: Seek additonal
software used to enrich and support curriculum needs.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Technology Planning
Committee
Evidence: Needs accessment survey, Texas STaR Chart, Software
purchased.
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06, I07,
I08, I09, I10, I11, I12, I14, I15
Strategy 3.2.4: Maintain support
computer driven business software such as PEIMS, RSCCC, LIBRARY
AUTOMATION
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Librarian, Staff
Evidence: Percentage of staff attending
training
Comments:
LRPT Correlates: I01, I02, I03, I04, I05, I06, I07,
I08, I09, I10, I11, I12, I13, I14, I15
Strategy 3.2.5: Provide
neccessary programming for distance learning console.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Technology Planning
Committee
Evidence: Programming operative
Comments:
LRPT Correlates:
EP11, I01, I02, I03, I07, I08, I09, I10, I11, I12, I13, I14, I15, TL16,
TL17
Strategy 3.2.6: Provide neccessary subscriptions for TPRI
identification of at risks students, AESIT identification of low perfomance
objectives and analysis tools.
State: Revised
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration, Campus
Principals, Technology Coordinator, Technology Planning Committee
Evidence:
licenses purchased, TRPI reports and teacher feedback.
Comments:
LRPT
Correlates: AS01, AS02, AS03, I01, I02, I07, I08, I10, TL01, TL02, TL07, TL08,
TL10, TL11
Strategy 3.2.7: Provide necessary software and
subscriptions neccessary for protection of BSISD LAN from viruses, spyware, and
other invasions.
State: Revised
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration, Campus Principals,
Technology Coordinator, Technology Planning Committee, Vendor, Region
VI
Evidence: Software and licenses purchased. Feedback from Technology
Coordinator, Teachers, Administration, Vendors.
Comments:
LRPT
Correlates: AS01, AS02, AS03, AS05, AS06, AS07, EP08, EP13, I01, I02, I10, I11,
I14, TL07, TL08, TL09, TL11, TL16, TL17, TL18
Goal 4: Establish technology as an integral part of
education.
Objective 4.1: Integrate and use technology for
instruction, enrichment, and reinforcement of classroom curriculum.
Budget
for this objective: $31,000.00
LRPT Category: Teaching and Learning
E-Rate
Correlates: ER01
NCLB Correlates: 01 02 03 04a 05 06 07 08 09 11 12
Strategy 4.1.1: Integrate age appropriate technology TEKS into
the curriculum in grades PreK-5
State: Original
Status: In
Progress
Timeline: 2006-2010
Person(s) Responsible: Administration,Campus
Principals, Technology Coordinator, Technology Planning Committee,
Faculty
Evidence: Lab log, lesson plans, teacher survey on student
performance.
Comments:
LRPT Correlates: AS01, AS02, AS03, TL01, TL02,
TL03, TL07, TL08, TL09, TL10, TL11, TL12, TL13, TL14, TL15, TL16, TL17, TL18,
TL20
Strategy 4.1.2: Integrate TEKS into other curriculum
areas.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals,
Evidence: Lesson Plans, Teacher survey on student performance
Comments:
LRPT Correlates: AS01, AS03, EP02, EP03, EP13, I01, I08, I10, TL01, TL02,
TL03, TL06, TL07, TL08, TL09, TL10, TL11, TL12, TL13, TL14, TL15, TL18, TL19,
TL20
Strategy 4.1.3: Use computer based curriculum such as Odyssey
to remediate students in core subject areas.
State: Original
Status: In
Progress
Timeline: 2004-2007
Person(s) Responsible: Administration,Campus
Principals, Technology Coordinator, Faculty
Evidence: Number of students that
successfully recover lost credits.
Comments:
LRPT Correlates: AS01, AS02,
AS03, EP02, EP03, EP04, EP13, I01, I08, I10, I11, I12, TL01, TL02, TL03, TL04,
TL05, TL06, TL07, TL08, TL09, TL10, TL11, TL14, TL15, TL16, TL17,
TL18
Strategy 4.1.4: Provide scope and sequence for technology
related courses.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator, Faculty, Counselor
Evidence: Scope and sequence of technology
classes
Comments:
LRPT Correlates: AS01, AS02, EP02, TL01, TL02, TL03,
TL04, TL05, TL06, TL07, TL08, TL09, TL10, TL11, TL12, TL14, TL15,
TL18
Strategy 4.1.5: Integrate and practice ethics in the use to
technology in compliance with District Accepable Use Policy.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Faculty
Evidence:
Acceptable Use Policy
Comments:
LRPT Correlates: AS01, AS02, AS06, EP03,
I01, I08, I10, TL01, TL02, TL03, TL04, TL05, TL06, TL07, TL08, TL09, TL10, TL11,
TL12, TL14, TL15, TL16, TL17, TL18, TL19, TL20
Strategy 4.1.6: Use
technology for instruction, enrichment and reinforcement of PreK-12 classroom
curriculum to improve student perfomance and productivity.
State:
Original
Status: In Progress
Timeline: 2006-2010
Person(s) Responsible:
Administration,Campus Principals, Technology Coordinator, Faculty
Evidence:
District performance indicators.
Comments:
LRPT Correlates: AS01, AS02,
AS03, EP02, EP03, EP04, I01, I02, I04, TL01, TL02, TL03, TL04, TL05, TL06, TL07,
TL08, TL09, TL10, TL11, TL12, TL13, TL14, TL15, TL16, TL17, TL18,
TL20
Strategy 4.1.7: Establish network of interactive video links
to offer a wider varitey of courses to students, faculty, and board
members.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator,
Evidence: Number of people enrolled in Distance Learning
Courses.
Comments:
LRPT Correlates: TL01, TL02, TL03, TL04, TL05, TL06,
TL07, TL08, TL09, TL10, TL11, TL12, TL13, TL14, TL15, TL16, TL17, TL18, TL19,
TL20, TL21
Strategy 4.1.8: Seek opportunites for
faculty/staff/students and community members to take college/career
courses.
State: Original
Status: In Progress
Timeline:
2006-2010
Person(s) Responsible: Administration,Campus Principals, Technology
Coordinator,
Evidence: Number of Courses offered
Comments:
LRPT
Correlates: TL01, TL02, TL03, TL04, TL05, TL06, TL07, TL08, TL09, TL10, TL11,
TL12, TL13, TL14, TL15, TL16, TL17, TL18, TL19, TL20, TL21
BUDGET
Total amount of Title II, Part D formula funds received for
the current year of this plan: $0.00
Method of application for formula funds: Local Application
Budget for year 2006
- Telecom cost: $155,785.00
- Telecom source: Fund
Balance 289, Impact aid
- Materials cost: $7,500.00
- Materials source:
General Operating
- Equipment cost: $7,500.00
- Equipment source: Title I,
Fund 289, Fund 411, Fund 4B
- Maintenance cost: $1,000.00
- Maintenance
source: General Operating
- Staff development cost: $5,000.00
- Staff
development source: Title I, General Operating
- Miscellaneous cost:
$1,000.00
- Miscellaneous source: General Operating
- Total:
$177,785.00
EVALUATION
Evaluation Process:
Evaluation of the Techlogy Plan
wil be an ongoing process. The technology planning will meet four times a year:
August, November, February, and May. The overall Technology plan will be
reviewed and edited once a year.
The technology planning committee will
be responsible for the ongoing evaluation of this plan. The intention of the
evaluation will be to make decisions on the impact that technology has on the
learning process for all students. An informal report will be given to the
Superintendent after each quarterly meeting. A formal report will be given to
the Superintendent and the board of Trustees once a year.
Evaluation Method:
Yearly inventory of hardware and software.
Teacher/parent surveys conducted yearly in regards to the use of technology
in the classroom.
Lab Logs.
Informal interviews of faculty/staff members
conducted by the Technology Planning Committee.
Lesson Plans
Performance
Indicators met by the students on TAKS test.
Number of Staff attending
Technology Professional Development.
Number of courses offered on Distance
Learning Equipment.
Number of people taking course through distance
learning.
Monitoring and documentation of community involvement.
Number
of Staff attaining minimum technology competencies.
Number of students that
are able to recover course credits.
TPRI reports and teacher feedback for
the Palm Pilot project. APPENDIX
Attachment item
A:
Acceptable use Policy
http://www.bigsandyisd.net/aup20051.pdf